{"id":73,"date":"2009-11-19T20:00:42","date_gmt":"2009-11-20T01:00:42","guid":{"rendered":"http:\/\/ammonsengineering.com\/blog\/?p=73"},"modified":"2009-12-05T00:51:26","modified_gmt":"2009-12-05T05:51:26","slug":"mounted-rack","status":"publish","type":"post","link":"https:\/\/ammonsengineering.com\/blog\/2009\/11\/mounted-rack\/","title":{"rendered":"Mounted rack"},"content":{"rendered":"<p>Drilled holes in shelf and attached rack gear.\u00a0 It looks pretty good.\u00a0 Now I just need to find time to finish building the cart and get it all mounted on the shelf.<\/p>\n<p>The first picture is the entire shelf with the rack mounted flush to the front edge.\u00a0 The second picture shows a closeup where the rack gear is attached to the aluminum bar using bolts, and the aluminum bar is attached to the shelf using wood screws.<\/p>\n<div id=\"attachment_14\" style=\"width: 610px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/ammonsengineering.com\/blog\/wp-content\/uploads\/2009\/12\/Shelf-with-Rack.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-14\" class=\"size-full wp-image-14\" title=\"Shelf with Rack\" src=\"http:\/\/ammonsengineering.com\/blog\/wp-content\/uploads\/2009\/12\/Shelf-with-Rack.jpg\" alt=\"Shelf with rack attached\" width=\"600\" height=\"148\" srcset=\"https:\/\/ammonsengineering.com\/blog\/wp-content\/uploads\/2009\/12\/Shelf-with-Rack.jpg 600w, https:\/\/ammonsengineering.com\/blog\/wp-content\/uploads\/2009\/12\/Shelf-with-Rack-300x74.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><p id=\"caption-attachment-14\" class=\"wp-caption-text\">Shelf with rack attached<\/p><\/div>\n<div id=\"attachment_13\" style=\"width: 371px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/ammonsengineering.com\/blog\/wp-content\/uploads\/2009\/12\/Rack-Closeup.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-13\" class=\"size-full wp-image-13\" title=\"Rack Closeup\" src=\"http:\/\/ammonsengineering.com\/blog\/wp-content\/uploads\/2009\/12\/Rack-Closeup.jpg\" alt=\"Rack Closeup\" width=\"361\" height=\"200\" srcset=\"https:\/\/ammonsengineering.com\/blog\/wp-content\/uploads\/2009\/12\/Rack-Closeup.jpg 361w, https:\/\/ammonsengineering.com\/blog\/wp-content\/uploads\/2009\/12\/Rack-Closeup-300x166.jpg 300w\" sizes=\"auto, (max-width: 361px) 100vw, 361px\" \/><\/a><p id=\"caption-attachment-13\" class=\"wp-caption-text\">Rack Closeup<\/p><\/div>\n<p>This picture gives you an idea of what the whole system will look like once the cart is completely assembled and the linear bearing is mounted to the shelf.\u00a0 Of course, the second encoder will be moved to the new bracket on top of the cart once I make it.<\/p>\n<div id=\"attachment_3\" style=\"width: 370px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/ammonsengineering.com\/blog\/wp-content\/uploads\/2009\/12\/Whole-Assembly-Example.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-3\" class=\"size-full wp-image-3\" title=\"Whole Assembly Example\" src=\"http:\/\/ammonsengineering.com\/blog\/wp-content\/uploads\/2009\/12\/Whole-Assembly-Example.jpg\" alt=\"Whole system layout\" width=\"360\" height=\"240\" srcset=\"https:\/\/ammonsengineering.com\/blog\/wp-content\/uploads\/2009\/12\/Whole-Assembly-Example.jpg 360w, https:\/\/ammonsengineering.com\/blog\/wp-content\/uploads\/2009\/12\/Whole-Assembly-Example-300x200.jpg 300w\" sizes=\"auto, (max-width: 360px) 100vw, 360px\" \/><\/a><p id=\"caption-attachment-3\" class=\"wp-caption-text\">Whole system layout<\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Drilled holes in shelf and attached rack gear.\u00a0 It looks pretty good.\u00a0 Now I just need to find time to finish building the cart and get it all mounted on the shelf. The first picture is the entire shelf with the rack mounted flush to the front edge.\u00a0 The second picture shows a closeup where [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[],"class_list":["post-73","post","type-post","status-publish","format-standard","hentry","category-hardware"],"_links":{"self":[{"href":"https:\/\/ammonsengineering.com\/blog\/wp-json\/wp\/v2\/posts\/73","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ammonsengineering.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ammonsengineering.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ammonsengineering.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ammonsengineering.com\/blog\/wp-json\/wp\/v2\/comments?post=73"}],"version-history":[{"count":1,"href":"https:\/\/ammonsengineering.com\/blog\/wp-json\/wp\/v2\/posts\/73\/revisions"}],"predecessor-version":[{"id":74,"href":"https:\/\/ammonsengineering.com\/blog\/wp-json\/wp\/v2\/posts\/73\/revisions\/74"}],"wp:attachment":[{"href":"https:\/\/ammonsengineering.com\/blog\/wp-json\/wp\/v2\/media?parent=73"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ammonsengineering.com\/blog\/wp-json\/wp\/v2\/categories?post=73"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ammonsengineering.com\/blog\/wp-json\/wp\/v2\/tags?post=73"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}